Inside the engineering megaproject that went horribly wrong | Four Corners
Australia’s Snowy 2.0 was sold as a nation-building megaproject for a low-carbon future – and was meant to be feeding power into the grid by the end of 2024. Instead, the pumped hydro project, which was once estimated to cost $2 billion, is four years behind schedule and now forecast to hit $12 billion. In this documentary, Four Corners reveals the inside story of Snowy 2.0 and how it all went so horribly wrong.
Courtesy of ABC News In-depth on YouTube. Watch on YouTube ↗
Sponsored
More Technology Documentaries
Cicada 3301: An Internet Mystery2018•18m•HD•★8.9
The Internet's Own Boy: The Story of Aaron Swartz2014•1h 45m•HD•★8.7
How Big Oil Conquered the World2017•1h 11m•HD•★8.6
Tesla: Master of Lightning2016•1h 26m•HD•★8.6
The Wright Brothers and the Evolution of Aviation2022•1h 52m•HD•★7.6
The Insane Truth About Tiktok2021•50m•HD•★8.0
Secret History of Silicon Valley2019•1h 3m•HD•★8
The Biggest Mobile Work Machine In The World2020•49m•HD•★7.9
How ASML, TSMC And Intel Dominate The Chip Market | CNBC Marathon2022•57m•HD•★7.8
German Giants: Mega Engine Manufacturing | FD Engineering2024•49m•HD•★7.7
Lost Giants: Epic Shipwrecks of the Century (Full Episode) | Drain the Oceans2024•47m•4K•★7.7
AI is Evolving Faster Than You Think [GPT-4 and beyond]2023•25m•HD•★7.7